Albin Polasek Museum Rehab


Warning: A non-numeric value encountered in /home3/wad5vo0acnok/public_html/wp-content/plugins/new-royalslider/classes/rsgenerator/NewRoyalSliderGenerator.php on line 244

• Main and East Gallery renovations
• Installation of acoustically lined sheetmetal
• Ductwork designed to a 10” depth to minimize depth of new wall
• Drywall on metal framing chase wall and soffits
• Painting of new drywall