Minute Maid Freezer Renovation


Warning: A non-numeric value encountered in /home3/wad5vo0acnok/public_html/wp-content/plugins/new-royalslider/classes/rsgenerator/NewRoyalSliderGenerator.php on line 244

• Removal of 100,000sf of concrete slab in three phases
• Removed and thawed up to 15 feet of frozen soil, and then re-compacted the soil
• -10° Freezer
• Under floor glycol warming system
• 4-inch floor insulation
• 6-inch finish slab
• Performed renovation while maintaining the structural integrity of the building