Minute Maid Freezer Renovation

• Removal of 100,000sf of concrete slab in three phases
• Removed and thawed up to 15 feet of frozen soil, and then re-compacted the soil
• -10° Freezer
• Under floor glycol warming system
• 4-inch floor insulation
• 6-inch finish slab
• Performed renovation while maintaining the structural integrity of the building