Hanson Pipe and Precast


Warning: A non-numeric value encountered in /home3/wad5vo0acnok/public_html/wp-content/plugins/new-royalslider/classes/rsgenerator/NewRoyalSliderGenerator.php on line 244

• Design/Build
• Pre-engineered metal building
• 177,000sf
• 15,816.5 cubic yards of concrete used
• Remained under GMP and gave $300,000 back to owner
• Consists of two nearly identical production lines fabricated in Germany with tolerances of +/- 1/8 inch
• Completed on time