Coca Cola Refreshments Production Line Addition

R.C. Stevens Construction Company provided construction services for Coca Cola Refreshments. A new production line with structural steel columns, beams and joist with interior and exterior masonry walls was added. This 15,000 square foot addition included a concrete foundation wall with dock high slab and slab removal for under floor plumbing retrofit. A 450hp High Pressure Air Compressor and boiler with necessary piping was also installed.

A new wastewater treatment facility and recycling center were constructed in order to build the addition and recycling center where the existing wastewater treatment was located.

The key was staffing the project to succeed included working 7 days a week with double shifts when it was necessary.